QA Team
Ensuring quality and reliability through comprehensive testing
Expertise
- •Manual & Automated Testing
- •Test Strategy & Planning
- •Performance Testing
- •Security Testing
- •Regression Testing
- •Bug Tracking & Reporting
Technologies
Our Process
Test Planning
Defining test strategy and approach
- →Review requirements and user stories
- →Create test plan and test strategy document
- →Identify test scenarios and test cases
- →Determine testing tools and frameworks
- →Allocate resources and set timelines
Test Case Development
Writing detailed test cases and scenarios
- →Write test cases for all user stories
- →Create test data and test environments
- →Define expected results and acceptance criteria
- →Review test cases with development team
- →Organize test cases by priority and module
Manual Testing
Executing manual tests across features
- →Perform functional testing of new features
- →Conduct exploratory testing for edge cases
- →Test user interface and user experience
- →Verify cross-browser and device compatibility
- →Document bugs with detailed reproduction steps
Automated Testing
Building and maintaining automated test suites
- →Develop automated tests for regression testing
- →Implement end-to-end tests with Cypress/Playwright
- →Create API tests using Postman or REST Assured
- →Integrate automated tests into CI/CD pipeline
- →Maintain and update test scripts regularly
Performance & Security Testing
Ensuring application performance and security
- →Conduct load testing with JMeter or k6
- →Perform stress testing to identify bottlenecks
- →Test application security and vulnerabilities
- →Verify API response times and scalability
- →Document performance metrics and recommendations
Bug Reporting & Retesting
Tracking issues and verifying fixes
- →Log bugs in issue tracking system (Jira/Linear)
- →Prioritize bugs by severity and impact
- →Collaborate with developers on bug fixes
- →Retest fixed bugs to verify resolution
- →Perform regression testing after fixes
At least two team members have reviewed and approved the code changes
Code follows team coding standards, style guide, and best practices
ESLint/Prettier passes with zero errors and warnings
Complex logic is well-documented with clear comments and JSDoc
All console.log statements and debug code removed from production
Minimum 80% code coverage with meaningful unit tests
All integration tests pass successfully in CI/CD pipeline
Feature tested manually across different scenarios and edge cases
Verified functionality in Chrome, Firefox, Safari, and Edge
Tested on mobile devices (iOS/Android) and tablets
Existing features still work correctly after changes
All user inputs are validated and sanitized to prevent injection attacks
Proper authentication and authorization checks implemented
No API keys, passwords, or sensitive data exposed in code
All API calls use HTTPS and secure communication protocols
No critical or high-severity vulnerabilities in dependencies
Proper CORS and Content Security Policy configured
Page load time, API response time meet performance targets
Images optimized and compressed, using appropriate formats (WebP, AVIF)
Large components and routes are code-split and lazy-loaded
Database queries optimized with proper indexes and efficient joins
Appropriate caching (Redis, CDN) for static and dynamic content
JavaScript bundle size within acceptable limits (< 200KB gzipped)
Meets WCAG 2.1 Level AA accessibility standards
All interactive elements accessible via keyboard navigation
Tested with screen readers (NVDA, JAWS, VoiceOver)
Text and interactive elements meet minimum contrast ratios (4.5:1)
Proper ARIA labels and semantic HTML elements used
Clear focus indicators for all interactive elements
README.md includes setup instructions, dependencies, and usage
API endpoints documented with request/response examples
CHANGELOG.md updated with new features, fixes, and breaking changes
All required environment variables documented in .env.example
Deployment procedures documented for production release
Database migration scripts created and tested
Database backup completed before deployment
Rollback procedure documented and tested
Data validation and integrity checks implemented
All automated tests passing in CI/CD pipeline
Feature deployed and tested in staging environment
All production environment variables configured correctly
Error tracking and performance monitoring set up
Release notes prepared for stakeholder communication
Plan for verifying production deployment is successful